Implementation period: 2022.
Project: Dust purification of gases in the pellet production process
Objective: To conduct tests of FKI-5.3 unit to assess the efficiency of purification..
Description: Tests were conducted. Air purification parameters were obtained when using the unit within the iron ore pellets production technology.
Implementation period: 2022-2023.
Project: Modernization of the filtration section of the pelletizing shop of the Pelletizing and Metallization Plant with the installation of vacuum filters with ceramic sectors.
Objective: Increase of productivity. Installed instead of existing disk vacuum filters.
Description: 6 CDF-90 (rus. КДФ-90) units with additional equipment were delivered to the customer, supervised installation and commissioning works were carried out, software for APCS and visualization of the object was developed, service maintenance is being carried out.
Implementation period: 2022-2023.
Project: Technical re-equipment of the magneto-enrichment plant and apatite-baddeleyite enrichment plant. Installation of ceramic disk vacuum filters CDF-90.4 (rus. КДФ-90.4).
Objective: Production and delivery of СDF vacuum disk filters with ceramic filtering elements and ceramic scrapers for sludge removal, complete with auxiliary equipment for filtration of iron and apatite concentrates of enrichment complexes.
Description: Working documentation was developed, industrial safety expertise was carried out, 16 KDF-90.4 (rus. КДФ-90.4) units with additional equipment were delivered to the customer, supervised installation and commissioning were performed, service maintenance is being carried out.
Implementation period: 2021-2023.
Project: Modernization of the filtration department of the III stage of the enrichment section of SSMaPPA JSC with installation of ceramic filter CDF-90 (rus. КДФ-90).
Objective:: Increase of productivity. Installed instead of existing disk vacuum filters.
Description: 7 CDF-90 (rus. КДФ-90) filter units with additional equipment were delivered to the customer, supervised installation and commissioning works were performed, service maintenance is being carried out.
Implementation period: 2020.
Project: Supply of filtering equipment
Задача:
Description: 2 CDF-85 (rus. КДФ-85) units with additional equipment were delivered to the customer, supervised installation and commissioning were performed, service maintenance is being carried out.
Implementation period: 2020-2022.
Project: Replacement of vacuum filters DOO-100 (rus. ДОО-100) with ceramic disk vacuum filters CDF-90 (rus. КДФ-90).
Objective: : Modernization of the filtration department TCOM No. 3 FОС (rus. ТКОМ № 3 ФОК) by installing 11 units of ceramic disc vacuum filters CDF-90 (rus. КДФ-90) to replace the existing 17 units of fabric vacuum filters DOO-100 (rus. ДОО-100). Modernization of filtration departments UO1, UO2 (rus. УО1, УО2) by installing 26 units of ceramic disc vacuum filters CDF-90 (rus. КДФ-90).
Description: 38 СDF-90 (rus. КДФ-90) filter units with additional equipment were delivered to the customer, supervised installation and commissioning were performed, service maintenance is being carried out.
Implementation period: 2019-2020..
Project: Technical re-equipment of the filtration and drying system of ANOF-2 (rus. АНОФ-2) with installation of ceramic disc vacuum filters at Section No. 15 of ANOF-2 (rus. АНОФ-2).
Objective: Creation of a reserve to ensure production of at least 1.5 million tonnes per year. Reduction of operating and energy costs. Ensuring the development of ANOF-2 (rus. АНОФ-2) production capacities to produce at least 2.0 million tonnes per year.
Description: Design and engineering documentation was developed, 5 CDF-85 (rus. КДФ-2) units with additional equipment were delivered to the customer, supervised installation and commissioning were performed, service maintenance is being carried out.
Implementation period: 2018-2020.
Project: Reconstruction of the filtering building and wet concentrate storage to improve concentrate quality.
Objective: Improvement of concentrate quality. Reduction of operating and energy costs.
Description: 4 CDF-90 (rus. КДФ-90) units with additional equipment were delivered to the customer, supervised installation and commissioning were performed, service maintenance is being carried out.
Implementation period: 2019.
Project: Reconstruction of the DRI pellet concentrate production line.
Objective: Stabilisation of pellet quality. Reduction of operating and energy costs.
Description: 6 CDF-90 (rus. КДФ-90) units with additional equipment were delivered to the customer, supervised installation and commissioning were carried out, service maintenance is being carried out.
Implementation period: 2019.
Project: Reconstruction on replacement of Larox Ceramec CC-45 filtering equipment with a 90m2 ceramic disc filter at the pellet production areas No.1,2.
Objective: Stabilisation of pellet quality. Reduction of operating and energy costs.
Description: 2 CDF-90 (rus. КДФ-90) units with additional equipment were delivered to the customer, supervised installation and commissioning were performed, service maintenance is being carried out.
Implementation period: 2023.
Project: Development of technical solutions for modernisation of the existing wet gas purification system of apatite concentrate drying drums to dry by experimental testing of the pilot installation of ceramic pulse filter FKI 5,3 (rus. ФКИ-5,3).
Objective: To reduce the drift of the finished product 0 - apatite concentrate.
Description: The work is fulfilled. The developed system and apparatuses of gas purification allow to return 6698 tonnes/year of apatite concentrate from one drying drum for sale to customers